Name of the Scheme |
Umngot HEP |
|
ROR / Storage |
260 MW |
|
GENERAL INFORMATION |
|
|
1. |
State |
Meghalaya |
|
2. |
Location : |
East Khasi Hills |
|
|
Dam type , Height, Power
House, Surface/UG |
|
|
(a) |
Latitude of Dam/Power House |
25° - 21’ – 38” |
|
(b) |
Longitude of Dam/Power
House |
92° - 6’ – 45” |
|
|
General Layout / Index map
may please be furnished. |
|
3. |
District |
East Khasi District,
Meghalaya |
|
4. |
Nearest G & D site |
Dam site |
|
5. |
Catchment area ner G&D site |
304.00 Km² |
|
6. |
Status of availability of
G&D site |
|
|
7. |
Basin/River |
Umngot |
|
8. |
Catchment area (Sq Km) |
304.00 Km² |
|
9. |
Type of Scheme
(ROR/Storage/PSS) |
Storage |
|
10. |
Firm Power
(MWc) |
40.97 MW |
|
11. |
Annual Energy Benefits
(GWh) |
850 Kwh |
|
12. |
Inter State Aspect |
Does not arise |
|
13. |
International Aspect |
Does not arise |
|
14. |
Defense Aspect |
Does not arise |
|
15. |
R&R Aspect |
Marginal cultivable lands |
|
16. |
Forest Area involved |
Marginal |
|
17. |
Geological problems
anticipated, if any |
Nil |
|
18. |
Accessibility – Nearest
Rail Head/ Road and distance from the project. |
Guwahati, (103 KM from
Shillong) |
|
19. |
Upstream scheme, if any |
Nil |
|
20. |
Downstream scheme, if any |
Umngot Stage II HEP
(Proposed) |
|
|
Project Features |
|
21. |
Type of Diversion Structure |
Concrete. |
|
a) |
Height (m) |
107.00 m |
|
b) |
FRL (M) |
1040.00 m |
|
c) |
MDDL (m) |
1008.6 m |
|
d) |
Live Storage
(MCum) |
51.63 |
|
22 |
Water conductor system |
|
|
a) |
Type |
Circular |
|
b) |
Length |
5700.00 m |
|
c) |
Diameter |
4.0 m |
|
23 |
Power House |
|
|
a) |
Type |
Over ground |
|
b) |
No. of Units |
2 |
|
c) |
Mead (m) |
820.00 m |
|
24 |
Tail Race Water Conductor
System |
|
|
a) |
Type |
|
|
b) |
Length (m) |
|
|
c) |
Size |
|
|
d) |
TWL (m) |
210.00 m |
|
Name of the Scheme |
Umngot HEP |
|
ROR / Storage |
260 MW |
|
1. |
Date of commencement of S&I |
2001-2002 |
|
2. |
Likely Date of completion
of S&I |
2005-2006 |
|
3. |
Likely Date of completion
of DPR |
2006-2007 |
|
4. |
Estimated cost of S&I/DPR
and Phasing of expenditure |
Rs. 430.58 Lakhs |
|
5. |
Agency of Investigation (in
case of Pvt. Agency, Name, Designation, Complete Adress, Telephone No. & Fax
No. is to be indicated) |
Executive Engineer,
Investigation Div-I,MeSEB. |
|
6. |
Details of Progress |
Quantity
Done Quantity to be done
|
|
a. |
Tracer Path & Approaches |
Completed |
|
b. |
Roads |
Nil |
|
c. |
Construction of Temp.
building |
Completed |
|
d. |
Purchase of special T&P |
Completed |
|
e. |
Topographic
Survey/Investigation |
Completed |
|
f. |
Cost Material (survey &
Testing) |
Initiated. |
|
g. |
Hydrological observations |
In progress |
|
h. |
Meteorological |
In progress |
|
I. |
Environmental Surveys |
Initiated. |
|
j. |
Programme of works during
the year yyyy-yy |
2006-2007 PPR Preparation |
|
k. |
Overall progress of works |
80% sufficient data for DPR
preparation |
|
l. |
Geological and foundation
investigations |
Completed , GSI Report
awaited. |
|
|
In case it is not possible
to give tentative quantity, it should be gives as percentage Financial
Progress. |
|
7. |
Estimated cost of Survey &
Investigation, with price level year. |
Rs. 430.58 Lakhs |
|
8. |
Expenditure incurred upto
March 2006 |
Rs. 135.573 Lakhs |
|
9. |
Expenditure incurred upto
June 2006 |
Rs. 137.633 Lakhs |
|
|
Expenditure incurred upto
Sept 2006 |
Rs. 154.638 Lakhs |
|
10. |
Budget Estimate yyyy-yy |
|
|
11. |
Revised Estimate yyyy-yy |
|
|
12. |
Budget Estimate yyyy-yy |
|
|
|
Bottlenecks if any. |
|