Back to Contents

 STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES
(PART I)

Name of the Scheme

New Umtru HEP

ROR / Storage

40 MW

GENERAL INFORMATION

 

1.

State

Meghalaya

2.

Location :

 

 

Dam type , Height, Power House, Surface/UG

Gated Structure

(a)   Overflow Section : 21:78 m

(b)   Non – overflow Section : 23.78 m

(a)

Latitude of Dam/Power House

26° - 0’ – 24”

(b)

Longitude of Dam/Power House

91° - 48’ – 49”

 

General  Layout / Index map may please be furnished.

3.

District

Ri Bhoi District, Meghalaya

4.

Nearest G & D site

Dam site

5.

Catchment area ner G&D site

1020.00 Km²

6.

Status of availability of G&D site

 

7.

Basin/River

Umtrew

8.

Catchment area (Sq Km)

1020.00 Km²

9.

Type of Scheme (ROR/Storage/PSS)

ROR with pendage

10.

Firm Power (MWc)

 

11.

Annual Energy Benefits (GWh)

193 MU

12.

Inter State Aspect

Does not arise

13.

International Aspect

Does not arise

14.

Defense Aspect

Does not arise

15.

R&R Aspect

Marginal

16.

Forest Area involved

Marginal

17.

Geological problems anticipated, if any

Nil

18.

Accessibility – Nearest Rail Head/ Road and distance from the project.

Guwahati, 26 KM

19.

Upstream scheme, if any

Umiam Stage I&II, Umiam Umtrew Stage III&IV

20.

Downstream scheme, if any

Nil

 

Project Features

21.

Type of Diversion Structure

Gated Structure  over existing Masonry Weir.

a)

Height (m)

(a) Overflow Section : 21.70 m

(b) Non Overflow Section : 23.78 m

b)

FRL (M)

130.10 m

c)

MDDL  (m)

123.30 m

d)

Live Storage (MCum)

2.65 MCum

22

Water conductor system

 

a)

Type

RCC Tunnel (Circular)

b)

Length

750.00 m

c)

Diameter

5.0 m

23

Power House

 

a)

Type

Deep set

b)

No. of Units

2

c)

Mead (m)

68.00 m

24

Tail Race Water Conductor System

 

a)

Type

Free-flow Tunnel (D-Shaped)

b)

Length (m)

785.00 m

c)

Size

5.50 M

d)

TWL (m)

62.00 m

                                   

STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES

(PART II)

 

Name of the Scheme

New Umtru HEP

ROR / Storage

40 MW

1.

Date of commencement of S&I

2004-2005

2.

Likely Date of completion of S&I

2005-2006

3.

Likely Date of completion of DPR

Completed

4.

Estimated cost of S&I/DPR and Phasing of expenditure

Rs. 188.99 Lakhs

5.

Agency of Investigation (in case of Pvt. Agency, Name, Designation, Complete Adress, Telephone No. & Fax No. is to be indicated)

Executive Engineer, Investigation Div-I,MeSEB,Umiam

6.

Details of Progress

Quantity Done                             Quantity to be done

a.

Tracer Path & Approaches

Completed

b.

Roads

Not Required

c.

Construction of Temp. building

Not Required

d.

Purchase of special T&P

Taken up.

e.

Topographic Survey/Investigation

Completed

f.

Cost Material (survey & Testing)

Taken up.

g.

Hydrological observations

Still continuing

h.

Meteorological

Still continuing

I.

Environmental Surveys

Taken up.

j.

Programme of works during the year yyyy-yy

Detailed Surveys & Investigation

k.

Overall progress of works

Completed

l.

Geological and foundation investigations

Completed for DPR preparation.

 

In case it is not possible to give tentative quantity, it should be gives as percentage  Financial Progress.

7.

Estimated cost of Survey & Investigation, with price level year.

Rs. 188.19 Lakhs

8.

Expenditure incurred upto March 2006

Rs. 65.43 Lakhs

9.

Expenditure incurred upto June 2006

Rs. 66.617 Lakhs

 

Expenditure incurred upto Sept 2006

Rs. 70.526 Lakhs

10.

Budget Estimate yyyy-yy

 

11.

Revised Estimate yyyy-yy

 

12.

Budget Estimate yyyy-yy

 

 

Bottlenecks if any.