Back to Contents

 STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES
(PART I)

Name of the Scheme

Myntdu Leshka Stage II HEP

ROR / Storage

60 MW

GENERAL INFORMATION

 

1.

State

Meghalaya

2.

Location :

Jaintia Hills

 

Dam type , Height, Power House, Surface/UG

Concreta Gravity. 50.00 m

(a)

Latitude of Dam/Power House

25° - 13’ – 45”

(b)

Longitude of Dam/Power House

92° -13’ – 45”

 

General  Layout / Index map may please be furnished.

3.

District

Jaintia Hills District, Meghalaya

4.

Nearest G & D site

Dam site

5.

Catchment area ner G&D site

410.00 Sq Km

6.

Status of availability of G&D site

 

7.

Basin/River

Myntdu

8.

Catchment area (Sq Km)

410.00 Sq Km

9.

Type of Scheme (ROR/Storage/PSS)

ROR

10.

Firm Power (MWc)

 

11.

Annual Energy Benefits (GWh)

 

12.

Inter State Aspect

Does not arise

13.

International Aspect

Does not arise

14.

Defense Aspect

Does not arise

15.

R&R Aspect

Not anticipated

16.

Forest Area involved

Marginal

17.

Geological problems anticipated, if any

Nil

18.

Accessibility – Nearest Rail Head/ Road and distance from the project.

Guwahati, (230 KM)

19.

Upstream scheme, if any

Myntdu (Leshka) Stage I HEP (under construction)

Suchen & Selim (under investigation)

20.

Downstream scheme, if any

No

 

Project Features

21.

Type of Diversion Structure

Concrete Gravity Dam

a)

Height (m)

50.00 m

b)

FRL (M)

278.00 m

c)

MDDL  (m)

 

d)

Live Storage (MCum)

 

22

Water conductor system

RCC Tunnel

a)

Type

Circular

b)

Length

4.00 Km

c)

Diameter

3.50 m

23

Power House

 

a)

Type

Over ground

b)

No. of Units

2

c)

Mead (m)

170.00 m

24

Tail Race Water Conductor System

 

a)

Type

Open channel

b)

Length (m)

 

c)

Size

 

d)

TWL (m)

 

                                   

STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES

(PART II)

 

Name of the Scheme

Myntdu Leshka Stage II  HEP

ROR / Storage

60 MW

1.

Date of commencement of S&I

2004-2005

2.

Likely Date of completion of S&I

2006-2007

3.

Likely Date of completion of DPR

2006-2007

4.

Estimated cost of S&I/DPR and Phasing of expenditure

Rs. 293.75 Lakhs (CWC) + 322.5 Lakhs (as per PWD Sch of rates 04-05) = Rs 616.25 Lakhs.

5.

Agency of Investigation (in case of Pvt. Agency, Name, Designation, Complete Adress, Telephone No. & Fax No. is to be indicated)

Executive Engineer, North Eastern Investigation Divn No I, CWC, Jalbikashpur, Rongpur Part I, Silchar 9

Tele No. 03842/223939

6.

Details of Progress

Quantity Done                            Quantity to be done

a.

Tracer Path & Approaches

60% Completed for trace path & approach

b.

Roads

Yet to be taken up.

c.

Construction of Temp. building

60% Completed

d.

Purchase of special T&P

 

e.

Topographic Survey/Investigation

40% Completed

f.

Cost Material (survey & Testing)

Yet to be taken up

g.

Hydrological observations

In progress

h.

Meteorological

In progress

I.

Environmental Surveys

Yet to be taken up.

j.

Programme of works during the year yyyy-yy

Topographical survey works & Hydro meteorological data collection.

k.

Overall progress of works

40% Completed

l.

Geological and foundation investigations

Yet to be taken up.

 

In case it is not possible to give tentative quantity, it should be gives as percentage  Financial Progress.

7.

Estimated cost of Survey & Investigation, with price level year.

Rs. 616.25 Lakhs

8.

Expenditure incurred upto March 2006

Rs. 118.86  Lakhs

9.

Expenditure incurred upto June 2006

Rs. 119.46  Lakhs

 

Expenditure incurred upto Sept 2006

Rs. 125.558  Lakhs

10.

Budget Estimate yyyy-yy

 

11.

Revised Estimate yyyy-yy

 

12.

Budget Estimate yyyy-yy

 

 

Bottlenecks if any.