Back to Contents

 STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES
(PART I)

Name of the Scheme

Ganol  HE Project

ROR / Storage

 2 X 12.50 (MW)

GENERAL INFORMATION

 

1.

State

Meghalaya

2.

Location :

Tura

 

Dam type , Height, Power House Surface/UG

Concrete  Gravity Type, Height 40 meters, Power House Surface.

(a)

Latitude of Dam/Power House

25° - 33’ – 50” N.

(b)

Longitude of Dam/Power House

90° - 12’ – 35” E.

 

General  Layout / Index map may please be furnished.

3.

District

Meghalaya

4.

Nearest G & D site

Near the Dam site and Power House Site.

5.

Catchment area ner G&D site

106.708 Sq Km

6.

Status of availability of G&D site

Approachable through footpath.

7.

Basin/River

Ganol

8.

Catchment area (Sq Km)

106.708 Sq Km

9.

Type of Scheme (ROR/Storage/PSS)

ROR Schemes  

10.

Firm Power (MWc)

 

11.

Annual Energy Benefits (GWh)

63  Gwh

12.

Inter State Aspect

Within the State itself

13.

International Aspect

Nil

14.

Defense Aspect

No defense Installation

15.

R&R Aspect

Does not arise

16.

Forest Area involved

To be taken up

17.

Geological problems anticipated, if any

Sub-surface Investigation is to be taken up.

18.

Accessibility – Nearest Rail Head/ Road and distance from the project.

Rail Head 213 KM

Road 10 Km

19.

Upstream scheme, if any

Nil

20.

Downstream scheme, if any

Nil

 

Project Features

21.

Dam

 

a)

Height (m)

40.00 m

b)

Top elevation

340 m

c)

Type

Concrete gravity

22

Water conductor system

 

a)

Type

Circular

b)

Length

2.00 Km

c)

Diameter

2.75 m

23

Power House

 

a)

Type

Over ground / Surface

b)

No. of Units

2

c)

Head (m)

120.00 m

 

STATUS OF SURVEY & INVESTIGATION OF HYDRO ELECTRICAL SCHEMES

(PART II)

 

Name of the Scheme

Ganol HE Project

ROR / Storage

2 X 12.5  MW

1.

Date of commencement of S&I

2005-2006

2.

Likely Date of completion of S&I

2006-2007

3.

Likely Date of completion of DPR

2006-2007

4.

Estimated cost of S&I/DPR and Phasing of expenditure

Rs. 72.00 Lakhs

5.

Agency of Investigation (in case of Pvt. Agency, Name, Designation, Complete Adress, Telephone No. & Fax No. is to be indicated)

MeSEB.

6.

Details of Progress

Quantity Done                             Quantity to be done

       50%                                                  50%

a.

Tracer Path & Approaches

Trace Path

b.

Roads

Roads to be taken up

c.

Construction of Temp. building

Under construction

d.

Purchase of special T&P

Not yet taken up.

e.

Topographic Survey/Investigation

Completed

f.

Cost Material (survey & Testing)

To be taken up.

g.

Hydrological observations

Data collected since March 2006

h.

Meteorological

Data collected since March 2006

I.

Environmental Surveys

To be taken up.

j.

Programme of works during the year yyyy-yy

 

k.

Overall progress of works

 

l.

Geological and foundation investigations

To be taken up.

 

In case it is not possible to give tentative quantity, it should be gives as percentage  Financial Progress.

7.

Estimated cost of Survey & Investigation, with price level year.

Rs. 261.38 Lakhs

8.

Expenditure incurred upto June 2006

Rs. 25.50 Lakhs

9.

Expenditure incurred upto Sept 2006

Rs. 35.25 Lakhs

10.

Budget Estimate yyyy-yy

Rs. 50.00 Lakhs for three Projects

11.

Revised Estimate yyyy-yy

 

12.

Budget Estimate yyyy-yy

 

 

Bottlenecks if any.

Paucity of Fund and lack of man power.