Name of the Scheme |
Ganol HE Project |
|
ROR / Storage |
2 X 12.50 (MW) |
|
GENERAL INFORMATION |
|
|
1. |
State |
Meghalaya |
|
2. |
Location : |
Tura |
|
|
Dam type , Height, Power
House Surface/UG |
Concrete Gravity Type,
Height 40 meters, Power House Surface. |
|
(a) |
Latitude of Dam/Power House |
25° - 33’ – 50” N. |
|
(b) |
Longitude of Dam/Power
House |
90° - 12’ – 35” E. |
|
|
General Layout / Index map
may please be furnished. |
|
3. |
District |
Meghalaya |
|
4. |
Nearest G & D site |
Near the Dam site and Power
House Site. |
|
5. |
Catchment area ner G&D site |
106.708 Sq Km |
|
6. |
Status of availability of
G&D site |
Approachable through
footpath. |
|
7. |
Basin/River |
Ganol |
|
8. |
Catchment area (Sq Km) |
106.708 Sq Km |
|
9. |
Type of Scheme
(ROR/Storage/PSS) |
ROR Schemes |
|
10. |
Firm Power
(MWc) |
|
|
11. |
Annual Energy Benefits
(GWh) |
63 Gwh |
|
12. |
Inter State Aspect |
Within the State itself |
|
13. |
International Aspect |
Nil |
|
14. |
Defense Aspect |
No defense Installation |
|
15. |
R&R Aspect |
Does not arise |
|
16. |
Forest Area involved |
To be taken up |
|
17. |
Geological problems
anticipated, if any |
Sub-surface Investigation
is to be taken up. |
|
18. |
Accessibility – Nearest
Rail Head/ Road and distance from the project. |
Rail Head 213 KM
Road 10 Km |
|
19. |
Upstream scheme, if any |
Nil |
|
20. |
Downstream scheme, if any |
Nil |
|
|
Project Features |
|
21. |
Dam |
|
|
a) |
Height (m) |
40.00 m |
|
b) |
Top elevation |
340 m |
|
c) |
Type |
Concrete gravity |
|
22 |
Water conductor system |
|
|
a) |
Type |
Circular |
|
b) |
Length |
2.00 Km |
|
c) |
Diameter |
2.75 m |
|
23 |
Power House |
|
|
a) |
Type |
Over ground / Surface |
|
b) |
No. of Units |
2 |
|
c) |
Head (m) |
120.00 m |
|
Name of the Scheme |
Ganol HE Project |
|
ROR / Storage |
2 X 12.5 MW |
|
1. |
Date of commencement of S&I |
2005-2006 |
|
2. |
Likely Date of completion of
S&I |
2006-2007 |
|
3. |
Likely Date of completion of
DPR |
2006-2007 |
|
4. |
Estimated cost of S&I/DPR
and Phasing of expenditure |
Rs. 72.00 Lakhs |
|
5. |
Agency of Investigation (in
case of Pvt. Agency, Name, Designation, Complete Adress, Telephone No. & Fax
No. is to be indicated) |
MeSEB. |
|
6. |
Details of Progress |
Quantity
Done Quantity to be
done
50% 50% |
|
a. |
Tracer Path & Approaches |
Trace Path |
|
b. |
Roads |
Roads to be taken up |
|
c. |
Construction of Temp.
building |
Under construction |
|
d. |
Purchase of special T&P |
Not yet taken up. |
|
e. |
Topographic
Survey/Investigation |
Completed |
|
f. |
Cost Material (survey &
Testing) |
To be taken up. |
|
g. |
Hydrological observations |
Data collected since March
2006 |
|
h. |
Meteorological |
Data collected since March
2006 |
|
I. |
Environmental Surveys |
To be taken up. |
|
j. |
Programme of works during
the year yyyy-yy |
|
|
k. |
Overall progress of works |
|
|
l. |
Geological and foundation
investigations |
To be taken up. |
|
|
In case it is not possible
to give tentative quantity, it should be gives as percentage Financial
Progress. |
|
7. |
Estimated cost of Survey &
Investigation, with price level year. |
Rs. 261.38 Lakhs |
|
8. |
Expenditure incurred upto
June 2006 |
Rs. 25.50 Lakhs |
|
9. |
Expenditure incurred upto
Sept 2006 |
Rs. 35.25 Lakhs |
|
10. |
Budget Estimate yyyy-yy |
Rs. 50.00 Lakhs for three
Projects |
|
11. |
Revised Estimate yyyy-yy |
|
|
12. |
Budget Estimate yyyy-yy |
|
|
|
Bottlenecks if any. |
Paucity of Fund and lack of
man power. |