Stage III Power Station

Umiam Stage-III was the next stage of development in the Umtru basin. The power house with 2 units of 30 MW each was commissioned in the early part of 1979.

With the commissioning of Stage-III power station, the total installed capacity from the four power stations in the Umiam-Umtru basin was 125 MW with an available firm power of 37 MW. The machines installed in this power house are from Bharat Heavy Electrical Limited, India.

Name of Power Stations Location Unit Capacity Date of Commissioning
Umiam Umtru Stage III Kyrdemkulai I 30 MW 26.01.1979
II 30 MW 30.03.1979